When I first read the titile, I thought that the US is going to have to build A LOT to triple global production. Then it occured to me that the author means the US is pledging to make deals and agreements which enable other countries to build their own. Sometimes I think the US thinks too much of itself and that's also very much part of American branding.
Where are my renewable bros at? Tell me this is bad.
I’m a renewable bro. I wanna see as much money pumped into as much infrastructure for renewables as possible. I wanna see solar on every building. I wanna see off-shore wind and tidal energy production. I’m keenly following development of clean, efficient, and cost-effective energy storage technologies, and much is being done in this space to support a future switch to full renewable reliance.
That won’t change the fact that we need on-demand energy now and we need to stop using coal and gas as soon as possible. We currently don’t have energy storage at scale. We will, but we don’t. So in the meantime, nuclear is probably the best option to pursue for use over the next couple of decades while we continue to invest in, and implement, renewables.
I will have to strongly disagree here. The timelines are actually the main reason why I would disqualify Nuclear power as a solution to energy, even as a temporary one.
The time from inception to going online for a new Nuclear reactor is in the range of 15-25 years. Of course we could attempt to shorten that, but that would probably mean compromising on safety. So indeed, if we want to stop using fossil fuels asap, building solar, wind, and hydro, which come online in a matter of months (maybe years for hydro), is much faster.
Aggravating this are two further issues: Current Nuclear energy production is non-renewable, and supply problems are already known to occur at current energy production levels. Second, the global construction capacity is limited, probably to around current levels. Even if we do not push for faster construction times, the number of companies and indeed people who have the necessary expertise are already at full capacity, and again, expanding that would probably imply safety problems.
That is to say, currently running Nuclear power plants are save and clean, so by all means keep doing it until renewables take over. But expanding Nuclear power to solve the energy problem is a non-starter for me, due to the timeline and it being non-renewable. And that is before we start talking about the very real dangers of Nuclear power, which are not operational of course, but due to proliferation, war, and governmental or general societal instability (due to say, climate change).
In the US. In China, nuclear reactors go from first pour to operation in 5-6 years. Economies of scale apply.
I think it's less that it would mean compromising on safety and more that it would mean compromising on the appearance of safety because we'd have to stop letting the courts delay construction while they indulge everybody who tries to sue to stop it with meritless claims.
Also -- and I say this as a Georgia Power ratepayer on the hook for the vast cost overruns for Plant Vogtle 3 and 4 -- we would need to import foreign labor or something because here in the US we are demonstrably too incompetent and corrupt to do it properly ourselves.
Exactly. I'm 100% on board with both renewables and nuclear, but the time to build nuclear would seem to have passed. We're a few decades too late.
That's not too say we shouldn't be building any new nuclear plants - in particular modern designs like SMRs, but I think it would be wiser to focus our energy now on large, grid-scale storage to help smooth out intermittent generation from renewables.
It also takes 20years for a tree to grow, so I guess we should stop planting trees too. Good logic.
The rest of what you are saying is ignorant at best. "Global construction capacity" is constrained to current levels. How convenient that we can only build exactly the number of nuclear reactors we are currently building. But we can build an unlimited amount of solar panels, wind turbines and "hyrdo."
How long do you think it takes to "build hydro?" If you ignore any and all environmental costs of flooding valleys, then sure I guess you could do it pretty quickly, you'd probably have to relocate hundreds of thousands of people, but sure that sounds more feasible then building a nuclear reactor.
Current Nuclear energy production is non-renewably because of cold-war era treaties against enrichment and breeder reactors. The timeline for nuclear fuel to run out if you allow breeders, is after the sun burns out. So that's a non-issue. Not to mention other theoretical sources of nuclear fuel that we don't bother even looking at because it's cheaper to burn more coal.
What exactly do you mean by "in the meantime"? What kind of timeline do you envisage for the large scale rollout of nuclear energy? Do you seriously think it'll be possible to roll out nukes faster than building some more storage?
The problem is "some more storage" can't be done, the technology doesn't exist
You are not a true renewable energy bro if you allow nuclear to be built /hj
Hand job?