Caltrans whistleblower
Caltrans official says she was demoted for objecting to highway expansion
Objecting to highways should be a prerequisite for getting a transit planning job.
If q highway is overloaded, then the first thing to come to mind should be "do we need a rail line here?". Between those two cities, I think the answer is obvious. One more lane doesn't work. Reliable and fast rail does.
Just FYI, there are 2 rail lines between Davis and Sacramento running parallel to the highway.
It's a 20 minute train ride, but they want to expand the highway to 4 lanes each direction.
It would be so much better to add more stops along the rail and more frequent trains.