Skip Navigation

Day 28 of posting screenshots every day, of whatever I've been working on that day, until I run out of content or get bored

Rotor/Motor factor is fully-online and functional. Running at 1/8th clock, it's gonna take a whiiiiiiiiile to prime up and fully debug, though. Gives me plenty of time to do cosmetics, next time.

Logistics floors, again.

This one in particular was a little interesting. I've got 20 machines here making Cast Screws, and instead of trying to figure out the logistics of balancing these across 3 belts, I just took advantage of the fact that I also have 10 Rotor assemblers, that need to receive the screws, so I grouped all the Screw machines into pairs and each pair is just a dedicated single-belt feed straight to an assembler.

Actually had to cut TWO holes in the floors to fit the damn Sink. I don't actually mind, though, it ought to provide a nice little bit of flavor, when it's decorated.

What do y'all think? Better with or without the frame pillar supports for all the splitters and mergers?

1 comments